How IJM Timber cut energy costs by 25% - with no upfront investment
IJM Timber is one of Ireland’s leading timber importers and distributors. Faced with rising grid electricity costs and growing sustainability pressure from their customers, they chose Solar as a Service. In year one, it returned €21,500 in real cash savings.
The Brief
IJM Timber is a timber processing and distribution business operating from a facility in Monaghan. The site runs timber processing machinery and warehouse operations during daylight hours, generating a consistent and predictable electricity load throughout the working day.
Rising electricity costs were a concern, and the business was also increasingly aware of carbon scoring requirements emerging across the construction supply chain – particularly from customers operating on development sites with embodied carbon commitments. Reducing energy costs and strengthening the company’s sustainability position were both objectives, but not at the expense of capital that was needed in the core business.
The Installation
UrbanVolt designed and installed a 250kWp rooftop solar PV system on the IJM Timber facility, drawing on two panel configurations to maximise the available roof space: 186 Leapton Solar LP182*182-M-60MH-450W panels and 369 Leapton Solar LP166*166-M-72MH-450W panels, connected to two Huawei SUN2000-100KTL-M1 inverters. The system went live in early 2023.
Under the Solar PPA, IJM Timber pays only for the electricity consumed from the system, at a rate below the grid tariff. UrbanVolt owns the system and manages all monitoring, maintenance, and performance reporting.
CASH SAVED – YEAR ONE (2023)
€21,500
~£18,400
Redirected back into the business from day one
£ figure is approximate, based on EUR/GBP rate at time of publication
25%
ENERGY FROM SOLAR
A quarter of IJM Timber’s total site energy usage, covering the majority of their daytime operational load.
250kWp
SYSTEM SIZE
Commercial-scale rooftop installation designed around IJM Timber’s specific energy profile and roof capacity.
102,000kg
ANNUAL CO2 REDUCTION
Directly supporting IJM Timber’s sustainability commitments to their construction sector customers.
€0
UPFRONT INVESTMENT
Zero CAPEX solution, fully funded by UrbanVolt
555
PANELS
186 × Leapton Solar LP182*182-M-60MH-450W, 369 × Leapton Solar, LP166*166-M-72MH-450W
2
INVERTERS
Huawei SUN2000-100KTL-M1
In Operation
The system generates 25% of the facility’s electricity from solar, with annual CO₂ savings of 102,116kg. In the first full year of operation, IJM Timber saved €21,500 in energy costs.
"The more money we pay UrbanVolt, the happier we are."
The quote reflects the structure of the Solar PPA model directly: UrbanVolt’s revenue is tied to system generation, which means both parties benefit when the system performs well.
What the process looks like
We keep the process straightforward. To get started, we need your latest electricity bill and twelve months of interval data. From there:
1
We compile a desktop proposal tailored to your site and consumption profile
2
We coordinate a site visit to assess the electrical setup, roof structure, and civil specifications
3
We produce a detailed firm proposal with system size, generation estimate, tariff, and projected savings
4
Once the agreement is signed, installation begins
Book a solar consultation
Fill in your details to receive a comprehensive breakdown and analysis of the savings your building could generate with UrbanVolt. No strings attached.
Start your journey to energy independence.