How Cedarwood Furniture halved their electricity bill with solar, while running machines 24/7
Cedarwood Furniture has been designing and making kitchens, bedrooms, and furniture for over 20 years. With machinery running around the clock and electricity bills reaching €15,000–16,000, the case for solar was clear. Solar as a Service delivered from the first bill.
The Brief
Cedarwood Furniture has been manufacturing kitchens, bedrooms, and fitted furniture from its Co. Wexford facility for over 20 years. The business supplies sites across the south east and Dublin, with machinery running continuously throughout the working day. That level of activity means the site carries a large and predictable electricity load with limited scope to reduce consumption through operational changes alone.
Electricity bills were running at €15,000 to €16,000. Finding a way to reduce that overhead without capital expenditure was the objective.
The Installation
UrbanVolt installed a 180kWp rooftop solar PV system on the Cedarwood Furniture facility, comprising 391 Leapton Solar LP182*182-M-60-MH-460W panels connected to two Huawei SUN2000-100KTL-M1 inverters. The system went live on 12 February.
Under the Solar PPA, Cedarwood Furniture pays only for the electricity they consume from the system. UrbanVolt owns the asset and manages monitoring and maintenance throughout the contract term.
PROPORTION OF ELECTRICITY FROM SOLAR
35%
More than a third of Cedarwood Furniture’s energy now comes from the rooftop system, across a 24/7 manufacturing operation
180kWp
SYSTEM SIZE
A large-scale installation designed to meet the continuous daytime demand of a 24/7 manufacturing operation.
30,593kg
ANNUAL CO2 REDUCTION
A meaningful reduction in operational carbon footprint for a high-consumption manufacturing site.
€0
UPFRONT INVESTMENT
Zero CAPEX solution, fully funded by UrbanVolt
391
PANELS
Leapton Solar LP182*182-M-60-MH-460W (460W)
2
INVERTERS
Huawei SUN2000-100KTL-M1
In Operation
35% of the facility’s electricity now comes from on-site solar generation, with annual CO₂ savings of 30,593kg. The impact on operating costs was immediate from the first billing period after commissioning.
"We’ve literally halved our bill."
The reduction in grid consumption has continued consistently, with 24/7 machinery demand meaning the site draws on solar generation throughout daylight hours every day of the working week.
What the process looks like
We keep the process straightforward. To get started, we need your latest electricity bill and twelve months of interval data. From there:
1
We compile a desktop proposal tailored to your site and consumption profile
2
We coordinate a site visit to assess the electrical setup, roof structure, and civil specifications
3
We produce a detailed firm proposal with system size, generation estimate, tariff, and projected savings
4
Once the agreement is signed, installation begins
Book a solar consultation
Fill in your details to receive a comprehensive breakdown and analysis of the savings your building could generate with UrbanVolt. No strings attached.
Start your journey to energy independence.